Due to ongoing bushfire activity, Australia Post operations have been impacted in a number of locations in ACT, WA Victoria and NSW
Due to ongoing bushfire activity, Australia Post operations have been impacted in a number of locations in ACT, WA Victoria and NSW

Aqua Cooler launches Australia-wide Water Cooler and Fountain Installation Service

Posted on November 25 2019


Did you know, leading Australian drinking water cooler and fountain company, Aqua Cooler now offers an installation option nationwide? No need to hire a tradesman to manage or implement your install.

We do the work, so you don’t have to.

Drinking Fountain Installation

Drinking Fountain Installation team will:
  • Unpack the unit from the carton and place on level ground.
  • Connect the unit to existing mains water point within 1.5m from the units install location.
  • Connect the unit to the existing drainage point to be within 1.5m from the units install location.
  • Plug the cooler in to an existing power outlet to be within 1m of the units install location, if safe to do so.
  • Test the cooler is producing cold water, there are no leaks and the flow and pressure is suitable.

    Materials supplied by plumber, included in price:

    • Inlet hose to go from customers’ existing mains water point to rear of unit.
    • Drainage materials, including P or S traps as required, to go from drainage outlet on rear of M Series Drinking Fountain into customers’ existing drainage point.
Drinking Fountain Installation team do not:
  • Dispose of the unit’s packaging after install.
  • Remove existing products from your site.
  • Perform after hours installation.
  • Absorb other costs included with the install (such as parking, site inductions etc).

Click here to see all features of the Drinking Fountain Installation Service.


Mains-Connected Water Coolers Installation

Mains Connected Water Cooler Installation team will:
  • Unpack the unit from the carton and place on level ground.
  • Connect the unit to existing mains water point within 5m of the units install location.
  • Plug the cooler in to an existing power outlet to be within 1m of the units install location, if safe to do so.
  • Test the cooler is producing cold water, there are no leaks and the flow and pressure is suitable.

    Materials supplied by plumber, included in price:

    • Water coolers are supplied with Dual Check PLV, 1/2" FBSP to 1/4" Push fit Tap Connection, 5 metres tubing. 
Mains Connected Water Cooler Installation team do not:
  • Dispose of the unit’s packaging after install.
  • Remove existing products from your site.
  • Perform after hours installation.
  • Absorb other costs included with the install (such as parking, site inductions etc).

Click here to see all features of the Mains Connected Water Cooler Installation Service.



Our new install offer takes the guess work out of finding the right company to get the job done. We are your one-stop shop when it comes to ensuring fresh, filtered water where you need it and when you need it and we believe it shouldn't stop at your unit purchase.

Aqua Cooler installation's are durable to last and comply with all current standards. Our installations meet accredited plumbing procedures for safety and efficiency. Please note, if additional materials are required, this will be charged directly from the plumber to you. Installation is powered by our installation partner, Taskforce.

More Posts

Related Posts

Meet the Team: Marketing Coordinator - Ellen Goddard
Every week we will be introducing a new member of our Aqua Cooler team with a fun look into who they are and what they d
Read More
Meet the Team: Sales and Operations Manager - Tim Dippl
Meet the team Every week we will be introducing a new member of our Aqua Cooler team and a short fun look into who they
Read More
Introducing New Under-Sink Filtration Systems
August 2019 marks the introduction of Aqua Cooler’s new dual Under-sink Filtration System Kits to purchase for your home
Read More